Infrastructures
Traffic Modeling for Border Island Expansion KFCA, Saudi Arabia - Bahrain
Sand Mitigation Study for Dammam-Jubail Railway Line, Saudi Arabia
Preparation of complete sand mitigation design report for the new railway line connecting Dammam and Jubail (CTW-120 Project), including modelling of sand accumulation along the alignment (segment-bysegment), development of sand risk models and design recommendations of countermeasures with maintenance and operational planning.
Preparation of complete structural design and shop drawings of Wadis crossings along Al-Jouf - Al-Qurrayat railway line including dynamic and static modelling of bridges to sustain High-Speed- Rail loads according to Eurocodes.